You have requested Quote for Part Number CK-104 LONG LEAD with NSN 5910-00-113-5499 from Crl Components Inc
-
Part Number: CK-104 LONG LEAD
-
Alternate P/N: CK104LONGLEAD
-
Manufacturer: Crl Components Inc
-
NSN: 5910-00-113-5499
-
Item Name : Capacitor Fixed Cer
-
CAGE Code: 71590
-
FSC: 5910 Capacitors
Part number CK-104 LONG LEAD is now available in our ready-to-ship inventory. The unique NSN for this part is 5910001135499. This part is Capacitor Fixed Cer manufactured by Crl Components Inc. Would you like to receive a quick quote for CK-104 LONG LEAD part? Fill out the form to get started.
All fields marked with an asterisk (*) must be carefully and completely filled out. Please make sure that you fill out Need Parts By and Quantity (ea) correctly before submitting the form as they determine a majority of your quote. One of our experts will respond within 15 minutes on the basis of your response to these fields.
Upload RFQ Sheet
If you have more than one item, upload your spreadsheet here
NSN Information for Part Number CK-104 LONG LEAD with NSN 5910-00-113-5499, 5910001135499
NSN | FSC | NIIN | CLS | Hazmat | DEMIL | Cancelled NSN |
---|---|---|---|---|---|---|
5910-00-113-5499 Item Description: Capacitor Fixed Cer | 5910 | 001135499 | 0 | P | A | |
CIIC | HCC | ESD | PMIC | Criticality | ENAC | |
U | A | A | 0 | |||
Part Number | ISC | RNVC | RNCC | HCC | MSDS | SADC |
Ck-104 Long Lead | B | 1 | C | A |
Characteristics Data of NSN 5910-00-113-5499, 5910001135499
MRC | Criteria | Characteristic |
---|---|---|
AAQL | BODY STYLE | W/O MTG FACILITIES TERMINAL(S) ON ONE SURFACE |
AARG | RELIABILITY INDICATOR | ESTABLISHED |
AARH | RELIABILITY FAILURE RATE LEVEL IN PERCENT | 0.0010 |
ABJT | TERMINAL LENGTH | 1.250 INCHES MINIMUM |
ADAQ | BODY LENGTH | 0.290 INCHES NOMINAL |
ADAT | BODY WIDTH | 0.290 INCHES NOMINAL |
ADAU | BODY HEIGHT | 0.090 INCHES NOMINAL |
AEBP | CENTER TO CENTER DISTANCE BETWEEN TERMINALS PARALLEL TO LENGTH | 0.200 INCHES NOMINAL |
AEBT | TERMINAL DIAMETER | 0.025 INCHES NOMINAL |
AEBZ | SCHEMATIC DIAGRAM DESIGNATOR | NO COMMON OR GROUNDED ELECTRODE(S) |
CQBF | INSULATION RESISTANCE AT MAXIMUM OPERATING TEMP | 10000.0 MEGOHMS |
CQBQ | CAPACITANCE VALUE PER SECTION | 0.100 MICROFARADS SINGLE SECTION |
CQFB | VOLTAGE TEMP LIMITS PER SECTION IN PERCENT CAPACITANCE CHANGE | -25.0/+15.0 WITH RATED VOLTAGE APPLIED SINGLE SECTION |
CQJJ | NONDERATED OPERATING TEMP | -55.0 DEG CELSIUS MINIMUM AND 125.0 DEG CELSIUS MAXIMUM |
CQWM | NONDERATED CONTINUOUS VOLTAGE RATING AND TYPE PER SECTION | 100.0 DC SINGLE SECTION |
CRTP | TOLERANCE RANGE PER SECTION | -10.00/+10.00 PERCENT SINGLE SECTION |
CWJK | CASE MATERIAL | PLASTIC |
CWPK | INSULATION RESISTANCE AT REFERENCE TEMP | 100000.0 MEGOHMS |
CWPM | DISSIPATION FACTOR AT REFERENCE TEMP IN PERCENT | 2.5000 |
CWSG | TERMINAL SURFACE TREATMENT | SOLDER |
NHCF | NUCLEAR HARDNESS CRITICAL FEATURE | HARDENED |
TEST | TEST DATA DOCUMENT | 81349-MIL-C-39014 SPECIFICATION (INCLUDES ENGINEERING TYPE BULLETINS, BROCHURES,ETC., THAT REFLECT SPECIFICATION TYPE DATA IN SPECIFICATION FORMAT; EXCLUDES COMMERCIAL CATALOGS, INDUSTRY DIRECTORIES, AND SIMILAR TRADE PUBLICATIONS, REFLECTI |
TTQY | TERMINAL TYPE AND QUANTITY | 2 UNINSULATED WIRE LEAD |
ZZZK | SPECIFICATION/STANDARD DATA | 81349-MIL-C-39014/2 GOVERNMENT SPECIFICATION |
Why Choose Us?
LOW PRICE
Warrantied inventory at competitive prices
FIND IT FAST
Search the world's largest inventory of electronic components by manufacturer, category or part number
QUALITY GUARANTEED
We sell only warrantied and traceable parts
GET IT FAST
All inventory ready to ship from our sellers
Top IT HARDWARE Manufacturers
Marvell |
Promethean |
Eltek |
Fsp Group |
Finisar |
Astec |
Lear |
Power Man |
Lam Search |
Eastern Research |